The gold mine in Uganda is the mixture of alluvial gold and rock gold. The main equipment are:
RXT1136 Trommel Scrubber*1
STLB60 Centrifugal Gold Concentrator*1
LS4500 Shaking Table*1
LY2100 Shaking Table*1
500*6000 Sluice Box*1
PE200*300 Jaw Crusher*1
MQG900*1800 Ball Mill*1
PD500*3500 Belt Conveyor*1
IS100-80-125A Water Pump*1
ST-80 Diesel Generator*1
Below is the alluvial gold part processing:
Below is the whole processing line:
The bottom materials of trommel scrubber are delivered to the centriguge for separation; The upper materials of trommel scrubber are sent to the crusher and ball mill for crushing so as to release the gold particles. The crushed fine particles are sent to the centrifuge for separation.
The amalgamator is used to process the concentrates of shaking table so as to recover the pure gold particles. After separating the gold particles from the mercury, the gold melting furnace will be applied to melt them in to gold bars.
Follow Us in LinkedIn
Follow Us in Youtube
Follow Us in Facebook